TABLE
OF CONTENTS
Introduction
Environmental Monitoring and Audit Progress
Breaches of Action and Limit Levels
Reporting Changes
Future Key Issues
Purpose of the report
Structure of the report
Background
Project Organization
Summary of Construction Works Undertaken During Reporting Month
Construction Programme
Status of Environmental Licences, Notifications and Permits
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedure
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedures
Maintenance and Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Parameters, Frequency
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters and Frequency
QA/QC Requirements
Results and Observations
Event and Action Plan
6 LAND CONTAMINATION (AMBIENT ARSENIC MONITORING)
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedure
Maintenance/Calibration
Laboratory Measurement / Analysis
Results and Observations
Event and Action Plan
Monitoring Requirement
Monitoring Parameters and Frequency
Monitoring Locations
Monitoring Equipment
Results and Observations
Event and Action Plan
Monitoring Requirement
Monitoring Location
Monitoring Parameters and Frequency
Monitoring Equipment
Results and Observations
Event and Action Plan
Monitoring of Measures to Minimise Disturbance to Water Birds in Ng Tung River, Sheung Yue River, Shek Sheung River and Long Valley
Monitoring of Measures to Minimise Impacts to Ma Tso Lung Stream and Siu Hang San Tsuen Stream, and Long Valley
Monitoring of Measures to Minimise Impacts on Ecological Sensitive Habitats from Disturbance and Pollution
Results and Observation
References
10 ENVIRONMENTAL SITE INSPECTION
Site Audits
Implementation Status of Environmental Mitigation Measures
Implementation Status of Water Quality Mitigation Measures
Solid and Liquid Waste Management Status
Ecological Mitigation Measures – Creation of Long Valley Nature Park (LVNP)
11 ENVIRONMENTAL NON-CONFORMANCE
Summary of Exceedances
Summary of Environmental Non-Compliance
Summary of Environmental Complaint
Summary of Environmental Summon and Successful Prosecution
Key Issues in the Coming Three Months
Monitoring Schedule for the Next Month
Construction Programme for the Next Month
13 CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Works Contracts under relevant Environmental Permit(s) in the Reporting Month
Table II Summary Table for EM&A Activities in the Reporting Month
Table III Summary Table for Events Recorded in the Reporting Month
Table IV Summary Table for Site Activities in the coming Two Months
Table 2.1a Summary of EPs under the Project and the Respective Work Contracts
Table 2.1b Summary of Scope of Works under Concerned EP
Table 2.2 Key Contacts of the Project
Table 2.3 Summary Table for Major Site Activities in the Reporting Month
Table 2.4 Status of Environmental Licences, Notifications and Permits
Table 3.1 Location for Air Quality Monitoring Locations
Table 3.2 Air Quality Monitoring Equipment
Table 3.3 Impact Dust Monitoring Parameters, Frequency and Duration
Table 3.4 Summary Table of 1-hour TSP Monitoring Results during the Reporting Month
Table 3.5 Summary Table of 24-hour TSP Monitoring Results during the Reporting Month
Table 3.6 Observation at Dust Monitoring Stations
Table 4.1 Location for Noise Monitoring Stations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Noise Monitoring Parameters, Duration and Frequency
Table 4.4 Summary Table of Noise Monitoring Results during the Reporting Month
Table 4.5 Observation at Noise Monitoring Stations
Table 5.1 Water Quality Monitoring Parameters and Frequency
Table 5.2 Additional Water Quality Monitoring Stations
Table 5.3 Water Quality Monitoring Equipment
Table 5.4 Additional Water Quality Monitoring Parameters and Frequency
Table 5.5 Method for Laboratory Analysis for Water Samples
Table 5.6 Summary of Water Quality Exceedances
Table 6.1 Location of Ambient Arsenic Monitoring station
Table 6.2 Ambient Arsenic Monitoring Equipment
Table 6.3 Impact Ambient Arsenic Monitoring Parameters, Frequency and Duration
Table 6.4 Summary Table of 24-hour RSP Monitoring Results during the Reporting Month
Table 7.1 Landfill Gas Monitoring Equipment
Table 8.1 Location of Construction Vibration Monitoring
Table 8.2 Vibration Monitoring Plan
Table 8.3 Vibration Limits for Construction Vibration Monitoring
Table 10.1 Summary of Site Audit
Table 10.2 Observations and Recommendations of Site Audit
Table 10.3 Photographic Records and Implementation Status of Measures
Table 10.5 Photographic Records of Site Activities in LVNP
LIST OF DRAWINGS
LIST OF FIGURES
Figure 1 Location of Air Quality Monitoring Station (KTN)
Figure 2 Location of Air Quality Monitoring Station (FLN)
Figure 3 Location of Noise Monitoring Station (KTN)
Figure 4 Location of Noise Monitoring Station (FLN)
Figure 5 Location of Additional Water Quality Monitoring Stations at River Beas
Figure 7 Location of Ambient Arsenic Monitoring Station
Figure 8 Location of Landfill Gas monitoring
Figure 10 Location of Monitoring Stations at Ma Tso Lung Stream and Siu Hang Sun Tsuen Stream
Figure 12 Site Layout Plan of Contract ND/2019/01 under EP-466-2013A
Figure 13 Site Layout Plan of Contract ND/2019/01 under EP-467-2013A
Figure 14 Site Layout Plan of Contract ND/2019/01 under EP-468-2013A
Figure 15 Site Layout Plan of Contract ND/2019/03 under EP-468-2013A
Figure 16 Site Layout Plan of Contract ND/2019/02 under EP-469-2013
Figure 17 Site Layout Plan of Contract ND/2019/01 under EP-470-2013A
Figure 18 Site Layout Plan of Contract ND/2019/03 under EP-473-2013A
Figure 19 Site Layout Plan of Contract ND/2019/04 under EP-473-2013A
Figure 20 Site Layout Plan of Contract ND/2019/05 under EP-473-2013A
Figure 21 Site Layout Plan of Contract ND/2019/06 under EP-475-2013A
Figure 22 Site Layout Plan of Contract ND/2019/04 under EP-546-2013
LIST OF APPENDICES
Appendix A Construction Programme
Appendix B Action and Limit Levels
Appendix C Copies of Calibration Certificates
Appendix D Environmental Monitoring Schedules
Appendix E Air Quality and Ambient Arsenic Monitoring Results and Graphical Presentation
Appendix F Noise Monitoring Results and Graphical Presentation
Appendix G Water Quality Monitoring Results and Graphical Presentations
Appendix H Laboratory Testing Reports for Laboratory Analysis
Appendix I Quality Control Reports for SS and Arsenic Laboratory Analysis
Appendix J Landfill Gas Monitoring Results
Appendix K Built Heritage Monitoring Results
Appendix L Ecological Monitoring Results
Appendix O Summary of Exceedance
Appendix Q Environmental Mitigation Implementation Schedule (EMIS)
Appendix R Waste Generation in the Reporting Month
Appendix T Summary of Successful Prosecution
Appendix U Summary Table for Required Submission under Environmental Permits